Год: 2018

Object: Nezhinsky GOK (pile works)

Construction of a mining and processing complex with a capacity of 1.1 to 2.0 million tons of potassium chloride per year on the raw material base of Nezhinsky (Eastern part) The Starobinsky deposit of potash salts.

JSC “Drilling Company “Delta” has completed the construction of pile foundations for the copra of the cage and skip trunks from bored piles using CFA technology (non-removable hollow auger) with a diameter of 800 mm and a depth of 15-17 meters in the amount of 230 pcs.:

Cage trunk: 60 bored piles with a depth of 16.45 m and 50 bored piles with a depth of 15.45 m
Skip barrel:  60 bored piles with a depth of 17.1 m and 60 bored piles with a depth of 15.1 m