Year: 2020

Kovykta gas condensate field is the largest  in the East of Russia by gas reserves. It is the base for the formation of the Irkutsk Gas Production Center and the resource base for the Power of Siberia gas pipeline along with the Chayandinsky field in Yakutia. Installation of a pile foundation and conducting static pile load tests at  condensate terminal site in the Okunaisky settlement (central booster compressor station) was awarded to Delta Drilling Company OJSC. The construction of the first piles began on 15.12.2020. The total amount of work is more than 10,000 piles.