“Booster compressor station at UKPG-3S of the Polar NGKM (1st stage)”
JSC Drilling Company Delta performed work on the device of hammered metal piles by drilling and drilling method with a diameter from 159 mm to 426 mm, a depth of 7 m to 19 m.
Год: 2016
“Booster compressor station at UKPG-3S of the Polar NGKM (1st stage)”
JSC Drilling Company Delta performed work on the device of hammered metal piles by drilling and drilling method with a diameter from 159 mm to 426 mm, a depth of 7 m to 19 m.