Год: 2015

JSC Drilling Company Delta performed the installation of drilling piles using CFA technology with a diameter of 800 mm, a depth of 30 m.
When installing bored piles with a depth of 30 meters in the city of Tula, a speed record was set for installing a reinforcing frame into a bored pile in 2 minutes