Krasnaya Zvezda Paper Mill, Chashniki

Год: 2011 «Modernization of the paper-making machine and the technological flow of mass preparation in the open joint-stock company «Krasnaya Zvezda Paper Mill» in Chashniki, Gagarina str., 20″ The modernization of the oldest city-forming enterprise of the district (and the paper mill is more than 130 years old) was included in the list of the…

CHP-16, Moscow

Year: 2011 «CHP-16 branch of JSC Mosenergo, Moscow. The device of drilling piles by vibration method with a lost tip with a diameter of 426mm, a depth of 16m. The power unit is implemented using modern combined-cycle gas technologies, which will ensure high efficiency of electric and thermal energy generation and minimize the negative impact…

Expoforum, St. Petersburg

Year: 2011 ExpoForum (Construction site) is a land plot at the address: Saint Petersburg, Shushary village, territory of the Shushary enterprise, plot 17 (Pulkovo) The device of bored piles with a diameter of 550mm, a depth of 16m according to CFA technology In some areas, piles were cut down according to the project documentation. The…

Marco City Business Center

Year: 2011 The device of bored piles under the protection of a casing pipe with a diameter of 325mm, 426mm, 530mm The Marco City complex, located in the city center on Lenin Street, is a multi-level structure crowned by pyramids of glass, concrete and metal: two 14 m high and one large with a square…

Mine No. 14 collector «Center», Minsk

Year: 2011 Extension of the collector «Center» to the treatment facilities in the industrial complex «Kolyadichi». Construction of the second line of the collector «Center» from the emergency release in the area of D. Vesnyanka to the Sports Palace by micro-tunneling. The 3rd stage of construction. Mine No. 14 is made of drilling piles with…

Mine No. 12 collector «Center», Minsk

Year: 2010 Extension of the collector «Center» to the treatment facilities in the industrial complex «Kolyadichi». Construction of the second line of the collector «Center» from the emergency release in the area of D. Vesnyanka to the Sports Palace by micro-tunneling. The 3rd stage of construction. Mine No. 12 is made of drilling piles with…