PJSC «Tulachermet-Steel»

Год: 2015 JSC Drilling Company Delta performed the installation of drilling piles using CFA technology with a diameter of 800 mm, a depth of 30 m. When installing bored piles with a depth of 30 meters in the city of Tula, a speed record was set for installing a reinforcing frame into a bored pile…

CHPP «Akademicheskaya», Yekaterinburg

Год: 2013 Customer: PJSC «T Plus» The Akademicheskaya CHPP is the most significant project implemented in Yekaterinburg over the past 30 years, having completed the largest investment program of PJSC T Plus.   The station is equipped with a unique combined-cycle gas plant and the most modern energy-saving equipment of Russian, Swiss and German production. The…

«BelAZ», Zhodino

Год: 2012 JSC «Belarusian Automobile Plant». Creation of capacities for the production of heavy-duty dump trucks in Zhodino. The device of bored piles under the protection of a casing pipe with a diameter of 920 mm, 1020 mm with a depth of 3 to 11 m. in the amount of 247 pcs. The device of…

CHP-12, Moscow

Год: 2012 PSU-220T Power Unit — Mosenergo branch — CHP-12 The device of drilling piles by vibration method (with a lost tip) diameter 426mm, depth 16m. in the amount of 1280 pcs. The device of drilling piles by vibration method (with a lost tip) diameter 426mm, depth 19m in the amount of 380pcs. The commissioning of a…